Lean Manufacturing is a generic process management philosophy derived mostly from the Toyota Production System (TPS) but also from other sources. Lean manufacturing in the automotive industry was the thing that really drove lean into manufacturing. It is renowned for its focus on reduction of the original Toyota 'seven wastes' in order to improve overall customer value. Lean is often linked with Six Sigma because of that methodology's emphasis on reduction of process variation (or its converse smoothness). Toyota's steady growth from a small player to the most valuable and the biggest car company in the world has focused attention upon how it has achieved this, making ‘Lean’ a hot topic in management science in the first decade of the 21st century.
For many, Lean is the set of TPS 'tools' that assist in the identification and steady elimination of waste (muda), the improvement of quality, and production time and cost reduction. To solve the problem of waste, Lean Manufacturing has several 'tools' at its disposal. These include continuous process improvement (kaizen), the ‘5 Whys’ and mistake-proofing (poka-yoke). In this way it can be seen as taking a very similar approach to other improvement methodologies. There is a second approach to Lean Manufacturing which is promoted by Toyota in which the focus is upon implementing the 'flow' or smoothness of work (opposite of mura, unevenness) through the system and not upon 'waste reduction' per se. Techniques to improve flow include production levelling, ‘pull’ production (by means of kanban) and the Heijunka box. The difference between these two approaches is not the goal but the prime approach to achieving it. The implementation of smooth flow exposes quality problems which always existed and thus waste reduction naturally happens as a consequence. The advantage claimed for this approach is that it naturally takes a system-wide perspective whereas a 'waste' focus has this perspective assumed. Some Toyota staff have expressed some surprise at the 'tool' based approach as they see the tools as work-arounds made necessary where flow could not be fully implemented and not as aims in themselves |
|
Both Lean and TPS can be seen as a loosely connected set of potentially competing principles whose goal is cost reduction by the elimination of waste.
These principles include:
• Pull processing: products are pulled from the consumer end (demand) just-in-time to be used, not pushed from the
production end (Supply)
• Perfect first-time quality - quest for zero defects, revealing & solving problems at the source
• Waste minimisation – eliminating all activities that do not add value & or are safety nets, maximize use of scarce
resources (capital, people and land)
• Continuous improvement – reducing costs, improving quality, increasing productivity and information sharing
• Flexibility – producing different mixes or greater diversity of products quickly, without sacrificing efficiency at lower volumes
of production
• Building and maintaining a long term relationship with suppliers through collaborative risk sharing, cost sharing and
information sharing arrangements
• Autonomation - if an abnormal situation arises then a machine or person must stop production in order to avoid defective
products and other waste
• Load levelling and Production flow - fluctuations in product flow increase waste because process capacity must always be
prepared for peak production
• Visual control - where the actual progress of work in comparison to daily production plans is clearly visible.
These principles include:
• Pull processing: products are pulled from the consumer end (demand) just-in-time to be used, not pushed from the
production end (Supply)
• Perfect first-time quality - quest for zero defects, revealing & solving problems at the source
• Waste minimisation – eliminating all activities that do not add value & or are safety nets, maximize use of scarce
resources (capital, people and land)
• Continuous improvement – reducing costs, improving quality, increasing productivity and information sharing
• Flexibility – producing different mixes or greater diversity of products quickly, without sacrificing efficiency at lower volumes
of production
• Building and maintaining a long term relationship with suppliers through collaborative risk sharing, cost sharing and
information sharing arrangements
• Autonomation - if an abnormal situation arises then a machine or person must stop production in order to avoid defective
products and other waste
• Load levelling and Production flow - fluctuations in product flow increase waste because process capacity must always be
prepared for peak production
• Visual control - where the actual progress of work in comparison to daily production plans is clearly visible.
The disconnected nature of some of these principles perhaps springs from the fact that the TPS has grown pragmatically as it responded to the problems it saw within its own production facilities. The TPS has been under development since about 1948 and continues to develop today. Thus what one sees today is the result of a 'need' driven learning to improve where each step has built on previous ideas and not something based upon a theoretical framework. Toyota's view is that the methodology is not the tools but the method of application of muda, mura, muri to expose the things the tools can address. Thus the 'tools' are adapted to different situations which explain any apparent incoherence of the 'principles' above.
Lean production, alternatively gaining distinction as the Toyota Product Development System (TPDS), is aimed at defining value, creating flow, and eliminating waste in every area and stage of work including customer relations, product design, supplier networks and factory management. Its goal is to incorporate less low-value human effort, less inventory, less time to develop products, and less space to become highly responsive to customer demand while producing top quality, error-proofed products in the most efficient and economical manner possible.'
The TPS has two pillar concepts: JIT (flow) and autonomation (smart automation). Adherence of the Toyota approach would say that 'flow' delivery of 'value' does all these improvements as a side-effect. If production 'flows' perfectly then there is no inventory, if customer valued features are the only ones produced then product design is simplified and effort is only expended on features the customer values. The other of the two TPS pillars is the very human aspect of 'autonomation' whereby automation is achieved with a human touch. This aims to give the machines enough 'intelligence' to recognise when they are working abnormally and flag this for human attention. Thus humans do not have to monitor normal production and only have to focus on abnormal, or fault, conditions. A reduction in human workload is probably much desired by all involved.
Lean is focused on getting the right things, to the right place, at the right time, in the right quantity to achieve perfect work flow while minimizing waste and being flexible and able to change. These concepts of flexibility and change are principally required to allow production levelling, using tools like SMED, but have their analogues in other processes such as R&D. The flexibility and ability to change are not open-ended, and therefore often expensive, capability requirements. More importantly, all of these concepts have to be understood, appreciated, and embraced by the actual employees who build the products and therefore own the processes. The cultural and managerial aspects of lean are just as important as the actual tools or methodologies of production itself. There are many examples of Lean tool implementation without sustained benefit and these are often blamed on weak understanding of Lean in the organisation. Lean aims to make the work simple enough to understand, to do and to manage. To achieve these three at once there is a belief held by some that Toyota's mentoring process (loosely called Senpai and Kohai relationship), so strongly supported in Japan, is one of the best ways to foster Lean Thinking up and down the organizational structure. The closest equivalent to Toyota's mentoring process is the concept of Lean Sensei, which encourages companies, organizations, and teams to seek out outside, third-party ‘Sensei’ that can provide unbiased advice and coaching.
The concept of waste being built into jobs and then taken for granted was noticed by motion efficiency expert Frank Gilbreth, who saw that masons bent over to pick up bricks from the ground. The bricklayer was therefore lowering and raising his entire upper body to get a 5 pound (2.3 kg) brick but this inefficiency had been built into the job through long practice. Introduction of a non-stooping scaffold, which delivered the bricks at waist level, allowed masons to work about three times as quickly, and with less effort.
Frederick Winslow Taylor, the father of scientific management, introduced what are now called standardization and best practice deployment. Taylor also warned explicitly against cutting piece rates (or, by implication, cutting wages or discharging workers) when efficiency improvements reduce the need for raw labor: "…after a workman has had the price per piece of the work he is doing lowered two or three times as a result of his having worked harder and increased his output, he is likely entirely to lose sight of his employer's side of the case and become imbued with a grim determination to have no more cuts if soldiering [marking time, just doing what he is told] can prevent it." This is now a foundation of lean manufacturing, because it is obvious that workers will not drive improvements they think will put them out of work.
Henry Ford continued this focus on waste while developing his mass assembly manufacturing system. "Ford's success has startled the country, almost the world, financially, industrially, mechanically. It exhibits in higher degree than most persons would have thought possible the seemingly contradictory requirements of true efficiency, which are: constant increase of quality, great increase of pay to the workers, repeated reduction in cost to the consumer. And with these appears, as at once cause and effect, an absolutely incredible enlargement of output reaching something like one hundredfold in less than ten years, and an enormous profit to the manufacturer".
Ford provided a single-paragraph description that encompasses the entire concept of waste. "I believe that the average farmer puts to a really useful purpose only about 5%. of the energy he expends. … Not only is everything done by hand, but seldom is a thought given to a logical arrangement. A farmer doing his chores will walk up and down a rickety ladder a dozen times. He will carry water for years instead of putting in a few lengths of pipe. His whole idea, when there is extra work to do, is to hire extra men. He thinks of putting money into improvements as an expense. … It is waste motion— waste effort— that makes farm prices high and profits low." Poor arrangement of the workplace-- a major focus of the modern kaizen-- and doing a job inefficiently out of habit-- are major forms of waste even in modern workplaces. Design for Manufacture (DFM) also is a Ford concept. However Ford's mass production system failed to incorporate the notion of Pull and thus often suffered from over production.
Toyota's development of ideas that later became Lean may have started at the turn of the 20th century with Sakichi Toyoda in their textile business with looms that stopped themselves when a thread broke which became the seed of ‘Autonomation’ and ‘Jidoka’. Toyota's journey with JIT may have started back in 1934 when it moved from textiles to produce its first car. Kiichiro Toyoda, founder of Toyota Motor Corp., directed the engine casting work and discovered many problems in their manufacture. He decided he must stop the repairing of poor quality by intense study of each stage of the process. In 1936 Toyota won its first truck contract with the Japanese government his processes hit new problems and developed the ‘Kaizen’ improvement teams.
Levels of demand in the Post War economy of Japan were low and the focus of mass production on lowest cost per item via economies of scale had little relevance. Having visited and seen supermarkets in the US Taiichi Ohno recognised the scheduling of work should not be driven by sales or production targets but by actual sales. Given the financial situation during this period over-production was not an option and thus the notion of Pull (rather than target driven Push) came to underpin production scheduling.
It was with Taiichi Ohno at Toyota that all these themes came together. He built on the already existing internal school of thought and spread its breadth and use into what has now become the Toyota Production System (TPS). It is principally from the TPS, but now including many other sources, that Lean production is developing. It is the scale, rigour and continuous learning aspects of the TPS which have made it a core of Lean.
Elimination of waste is the goal of Lean and Toyota defined three types of waste: muda or nonvalue-added work, muri or overburden and mura or unevenness.
Shigeo Shingo observed that it's only the last turn of a bolt that tightens it - the rest is just movement. This clarification of waste is ‘key’ to establishing distinctions between value-adding activity, waste and non-value adding work. Non-value adding work is waste that must be done under the present work conditions. It is key to measure, or estimate, the size of these wastes in order to demonstrate effect of the changes achieved and therefore the movement towards the goal.
The 'flow' (or smoothness) based approach aims to achieve JIT by removing the variation caused by work scheduling and thereby provide a driver, rationale or target and priorities for implementation, using a variety of techniques. The effort to achieve JIT exposes many quality problems that had been hidden by buffer stocks, by forcing smooth flow of only value-adding steps these problems become visible and must be dealt with explicitly.
Muri is all the unreasonable work that management imposes on workers because of poor organisation, such as carrying heavy weights, moving things around, dangerous tasks, etc. It's pushing a person or a machine beyond its natural limits. Unreasonable work is almost always a cause of variation.
To link these three concepts is straight forward. Firstly, Muri focuses on the preparation and planning of the process or what can be avoided proactively by design. Mura then focuses on implementation and the elimination of fluctuation at the scheduling or operations level, such as quality and volume. The third — Muda — is discovered after the process is in place and is dealt with reactively. It is seen through variation in output. It is the role of management to examine the Muda, or waste, in the processes and eliminate the deeper causes by considering the connections to Muri and Mura of the system. The Muda – waste – and Mura – inconsistencies – must be fed back to the Muri, or planning, stage for the next project.
A typical example of the interplay of these wastes is the corporate behaviour of ‘making the numbers’ as the end of a reporting period approaches. Demand surges (mura) where the ‘numbers’ are low which causes production to try to squeeze extra capacity from the process which causes routines and standards to be modified or stretched. This stretch and improvisation leads to muri style waste which leads to downtime, mistakes and backflows and waiting, thus the muda of waiting, correction and movement.
Observers who have toured Toyota plants have described their aim as 'learning to see' these wastes in order to carry back a new vision of 'ideal' to their parent companies.
The original seven muda 'deadly wastes' are:
• Overproduction (production ahead of demand)
• Transportation (moving products that is not actually required to perform the processing)
• Waiting (waiting for the next production step)
• Inventory (all components, work-in-progress and finished product not being processed)
• Motion (people or equipment moving or walking more than is required to perform the processing)
• Over Processing (due to poor tool or product design creating activity)
• Defects (the effort involved in inspecting for and fixing defects)
Some of these definitions may seem rather 'idealist' but this tough definition is seen as important. The clear identification of 'non-value adding work', as distinct from waste or work, is critical to identifying the assumptions behind the current work process and to challenging them in due course. In the words of Taiichi Ohno "eliminate muda, mura, muri completely". Breakthroughs in SMED and other process changing techniques rely upon clear identification of where untapped opportunities may lie if the processing assumptions are challenged.
Lean is about more than just cutting costs in the factory. One crucial insight is that most costs are assigned when a product is designed. Often an engineer will specify familiar, safe materials and processes rather than inexpensive, efficient ones. This reduces project risk, that is, the cost to the engineer, while increasing financial risks, and decreasing profits. Good organizations develop and review checklists to review product designs.
Companies must often look beyond the shop-floor to find opportunities for improving overall company cost and performance. At the system engineering level, requirements are reviewed with marketing and customer representatives to eliminate costly requirements. Shared modules may be developed, such as multipurpose power-supplies or shared mechanical components or fasteners. Requirements are assigned to the cheapest discipline. For example, adjustments may be moved into software and measurements away from a mechanical solution to an electronic solution. Another approach is to choose connection or power-transport methods that are cheap or that used standardized components that become available in a competitive market.
The role of the leaders within the organisation is the fundamental element of sustaining the progress of lean thinking. Experienced kaizen members at Toyota, for example, often bring up the concept of ‘Senpai, Kohai,’ and ‘Sensei,’ because they strongly feel that transferring of Toyota culture down and across the Toyota can only happen when a more experienced Toyota Sensei continuously coaches and guides the less experienced lean champions. Unfortunately, most lean practitioners in North America focuses on the tools and methodologies of lean, versus the philosophy and culture of lean. Some exceptions include Shingijitsu Consulting out of Japan, which is made up of ex-Toyota managers, and Lean Sensei International based in North America, which coaches lean through Toyota-style cultural experience.
One of the dislocative effects of Lean is in the area of KPIs (Key Process Indicators). The KPIs by which a plant/facility are judged will often be driving behaviour by leadership within it, e.g. Production against forecast, because the KPIs themselves assume a particular approach to the work being done. This can be an issue where for example a truly Lean, FRS and JIT approach is planned to be adopted because these KPIs will no longer reflect performance since the assumptions on which they are based become invalid. It is a key leadership challenge to manage the impact of this KPI chaos within the organisation.
Key focus areas for leaders are:
• PDCA thinking
• 'Go and See' philosophy (or ‘Genchi Genbutsu’)
• Process confirmation
Lean production, alternatively gaining distinction as the Toyota Product Development System (TPDS), is aimed at defining value, creating flow, and eliminating waste in every area and stage of work including customer relations, product design, supplier networks and factory management. Its goal is to incorporate less low-value human effort, less inventory, less time to develop products, and less space to become highly responsive to customer demand while producing top quality, error-proofed products in the most efficient and economical manner possible.'
The TPS has two pillar concepts: JIT (flow) and autonomation (smart automation). Adherence of the Toyota approach would say that 'flow' delivery of 'value' does all these improvements as a side-effect. If production 'flows' perfectly then there is no inventory, if customer valued features are the only ones produced then product design is simplified and effort is only expended on features the customer values. The other of the two TPS pillars is the very human aspect of 'autonomation' whereby automation is achieved with a human touch. This aims to give the machines enough 'intelligence' to recognise when they are working abnormally and flag this for human attention. Thus humans do not have to monitor normal production and only have to focus on abnormal, or fault, conditions. A reduction in human workload is probably much desired by all involved.
Lean is focused on getting the right things, to the right place, at the right time, in the right quantity to achieve perfect work flow while minimizing waste and being flexible and able to change. These concepts of flexibility and change are principally required to allow production levelling, using tools like SMED, but have their analogues in other processes such as R&D. The flexibility and ability to change are not open-ended, and therefore often expensive, capability requirements. More importantly, all of these concepts have to be understood, appreciated, and embraced by the actual employees who build the products and therefore own the processes. The cultural and managerial aspects of lean are just as important as the actual tools or methodologies of production itself. There are many examples of Lean tool implementation without sustained benefit and these are often blamed on weak understanding of Lean in the organisation. Lean aims to make the work simple enough to understand, to do and to manage. To achieve these three at once there is a belief held by some that Toyota's mentoring process (loosely called Senpai and Kohai relationship), so strongly supported in Japan, is one of the best ways to foster Lean Thinking up and down the organizational structure. The closest equivalent to Toyota's mentoring process is the concept of Lean Sensei, which encourages companies, organizations, and teams to seek out outside, third-party ‘Sensei’ that can provide unbiased advice and coaching.
The concept of waste being built into jobs and then taken for granted was noticed by motion efficiency expert Frank Gilbreth, who saw that masons bent over to pick up bricks from the ground. The bricklayer was therefore lowering and raising his entire upper body to get a 5 pound (2.3 kg) brick but this inefficiency had been built into the job through long practice. Introduction of a non-stooping scaffold, which delivered the bricks at waist level, allowed masons to work about three times as quickly, and with less effort.
Frederick Winslow Taylor, the father of scientific management, introduced what are now called standardization and best practice deployment. Taylor also warned explicitly against cutting piece rates (or, by implication, cutting wages or discharging workers) when efficiency improvements reduce the need for raw labor: "…after a workman has had the price per piece of the work he is doing lowered two or three times as a result of his having worked harder and increased his output, he is likely entirely to lose sight of his employer's side of the case and become imbued with a grim determination to have no more cuts if soldiering [marking time, just doing what he is told] can prevent it." This is now a foundation of lean manufacturing, because it is obvious that workers will not drive improvements they think will put them out of work.
Henry Ford continued this focus on waste while developing his mass assembly manufacturing system. "Ford's success has startled the country, almost the world, financially, industrially, mechanically. It exhibits in higher degree than most persons would have thought possible the seemingly contradictory requirements of true efficiency, which are: constant increase of quality, great increase of pay to the workers, repeated reduction in cost to the consumer. And with these appears, as at once cause and effect, an absolutely incredible enlargement of output reaching something like one hundredfold in less than ten years, and an enormous profit to the manufacturer".
Ford provided a single-paragraph description that encompasses the entire concept of waste. "I believe that the average farmer puts to a really useful purpose only about 5%. of the energy he expends. … Not only is everything done by hand, but seldom is a thought given to a logical arrangement. A farmer doing his chores will walk up and down a rickety ladder a dozen times. He will carry water for years instead of putting in a few lengths of pipe. His whole idea, when there is extra work to do, is to hire extra men. He thinks of putting money into improvements as an expense. … It is waste motion— waste effort— that makes farm prices high and profits low." Poor arrangement of the workplace-- a major focus of the modern kaizen-- and doing a job inefficiently out of habit-- are major forms of waste even in modern workplaces. Design for Manufacture (DFM) also is a Ford concept. However Ford's mass production system failed to incorporate the notion of Pull and thus often suffered from over production.
Toyota's development of ideas that later became Lean may have started at the turn of the 20th century with Sakichi Toyoda in their textile business with looms that stopped themselves when a thread broke which became the seed of ‘Autonomation’ and ‘Jidoka’. Toyota's journey with JIT may have started back in 1934 when it moved from textiles to produce its first car. Kiichiro Toyoda, founder of Toyota Motor Corp., directed the engine casting work and discovered many problems in their manufacture. He decided he must stop the repairing of poor quality by intense study of each stage of the process. In 1936 Toyota won its first truck contract with the Japanese government his processes hit new problems and developed the ‘Kaizen’ improvement teams.
Levels of demand in the Post War economy of Japan were low and the focus of mass production on lowest cost per item via economies of scale had little relevance. Having visited and seen supermarkets in the US Taiichi Ohno recognised the scheduling of work should not be driven by sales or production targets but by actual sales. Given the financial situation during this period over-production was not an option and thus the notion of Pull (rather than target driven Push) came to underpin production scheduling.
It was with Taiichi Ohno at Toyota that all these themes came together. He built on the already existing internal school of thought and spread its breadth and use into what has now become the Toyota Production System (TPS). It is principally from the TPS, but now including many other sources, that Lean production is developing. It is the scale, rigour and continuous learning aspects of the TPS which have made it a core of Lean.
Elimination of waste is the goal of Lean and Toyota defined three types of waste: muda or nonvalue-added work, muri or overburden and mura or unevenness.
Shigeo Shingo observed that it's only the last turn of a bolt that tightens it - the rest is just movement. This clarification of waste is ‘key’ to establishing distinctions between value-adding activity, waste and non-value adding work. Non-value adding work is waste that must be done under the present work conditions. It is key to measure, or estimate, the size of these wastes in order to demonstrate effect of the changes achieved and therefore the movement towards the goal.
The 'flow' (or smoothness) based approach aims to achieve JIT by removing the variation caused by work scheduling and thereby provide a driver, rationale or target and priorities for implementation, using a variety of techniques. The effort to achieve JIT exposes many quality problems that had been hidden by buffer stocks, by forcing smooth flow of only value-adding steps these problems become visible and must be dealt with explicitly.
Muri is all the unreasonable work that management imposes on workers because of poor organisation, such as carrying heavy weights, moving things around, dangerous tasks, etc. It's pushing a person or a machine beyond its natural limits. Unreasonable work is almost always a cause of variation.
To link these three concepts is straight forward. Firstly, Muri focuses on the preparation and planning of the process or what can be avoided proactively by design. Mura then focuses on implementation and the elimination of fluctuation at the scheduling or operations level, such as quality and volume. The third — Muda — is discovered after the process is in place and is dealt with reactively. It is seen through variation in output. It is the role of management to examine the Muda, or waste, in the processes and eliminate the deeper causes by considering the connections to Muri and Mura of the system. The Muda – waste – and Mura – inconsistencies – must be fed back to the Muri, or planning, stage for the next project.
A typical example of the interplay of these wastes is the corporate behaviour of ‘making the numbers’ as the end of a reporting period approaches. Demand surges (mura) where the ‘numbers’ are low which causes production to try to squeeze extra capacity from the process which causes routines and standards to be modified or stretched. This stretch and improvisation leads to muri style waste which leads to downtime, mistakes and backflows and waiting, thus the muda of waiting, correction and movement.
Observers who have toured Toyota plants have described their aim as 'learning to see' these wastes in order to carry back a new vision of 'ideal' to their parent companies.
The original seven muda 'deadly wastes' are:
• Overproduction (production ahead of demand)
• Transportation (moving products that is not actually required to perform the processing)
• Waiting (waiting for the next production step)
• Inventory (all components, work-in-progress and finished product not being processed)
• Motion (people or equipment moving or walking more than is required to perform the processing)
• Over Processing (due to poor tool or product design creating activity)
• Defects (the effort involved in inspecting for and fixing defects)
Some of these definitions may seem rather 'idealist' but this tough definition is seen as important. The clear identification of 'non-value adding work', as distinct from waste or work, is critical to identifying the assumptions behind the current work process and to challenging them in due course. In the words of Taiichi Ohno "eliminate muda, mura, muri completely". Breakthroughs in SMED and other process changing techniques rely upon clear identification of where untapped opportunities may lie if the processing assumptions are challenged.
Lean is about more than just cutting costs in the factory. One crucial insight is that most costs are assigned when a product is designed. Often an engineer will specify familiar, safe materials and processes rather than inexpensive, efficient ones. This reduces project risk, that is, the cost to the engineer, while increasing financial risks, and decreasing profits. Good organizations develop and review checklists to review product designs.
Companies must often look beyond the shop-floor to find opportunities for improving overall company cost and performance. At the system engineering level, requirements are reviewed with marketing and customer representatives to eliminate costly requirements. Shared modules may be developed, such as multipurpose power-supplies or shared mechanical components or fasteners. Requirements are assigned to the cheapest discipline. For example, adjustments may be moved into software and measurements away from a mechanical solution to an electronic solution. Another approach is to choose connection or power-transport methods that are cheap or that used standardized components that become available in a competitive market.
The role of the leaders within the organisation is the fundamental element of sustaining the progress of lean thinking. Experienced kaizen members at Toyota, for example, often bring up the concept of ‘Senpai, Kohai,’ and ‘Sensei,’ because they strongly feel that transferring of Toyota culture down and across the Toyota can only happen when a more experienced Toyota Sensei continuously coaches and guides the less experienced lean champions. Unfortunately, most lean practitioners in North America focuses on the tools and methodologies of lean, versus the philosophy and culture of lean. Some exceptions include Shingijitsu Consulting out of Japan, which is made up of ex-Toyota managers, and Lean Sensei International based in North America, which coaches lean through Toyota-style cultural experience.
One of the dislocative effects of Lean is in the area of KPIs (Key Process Indicators). The KPIs by which a plant/facility are judged will often be driving behaviour by leadership within it, e.g. Production against forecast, because the KPIs themselves assume a particular approach to the work being done. This can be an issue where for example a truly Lean, FRS and JIT approach is planned to be adopted because these KPIs will no longer reflect performance since the assumptions on which they are based become invalid. It is a key leadership challenge to manage the impact of this KPI chaos within the organisation.
Key focus areas for leaders are:
• PDCA thinking
• 'Go and See' philosophy (or ‘Genchi Genbutsu’)
• Process confirmation